Busy Beez Construction in Zebulon, NC

About Busy Beez Construction
From the website of Busy Beez Construction, read 15 Sept 2026. It describes what the company says it offers, not independent verification.
Busy Beez Construction handles septic system installation, septic inspections and excavation. Its work can cover both putting a new system in place and evaluating an existing one.
Septic Services in Zebulon
Quoted from the website of Busy Beez Construction, read 15 Sept 2026.
Septic System Installation
Septic Service Categories
These are how Google lists the business, not proof of a service offered.
Hours
- Monday to Friday
- 8:00 AM to 5:00 PM
Google Reviews
From the Google listing, checked 30 Aug 2026.
Grant and Crystal describe successful septic installations, while Jessica highlights help with planning and system placement. Paul and Margaret say the crew worked carefully around the property, answered questions and restored the yard after the job.
Map and Directions
Busy Beez Construction1264 Cheves Rd, Zebulon, NC 27597
Other Septic Companies in Zebulon
Certified Installer
The NC Onsite Wastewater Contractor and Inspector Certification Board lists Busy Beez Construction.
- License
- Installer Level II
- Number
- #6983
- Status
- on current list (effective 8 21 26, expires 12 31 26)
- Checked
- 11 Sept 2026
- License
- Inspector
- Number
- #6983I
- Status
- on current list (effective 8 21 26, expires 12 31 26)
- Checked
- 11 Sept 2026
Local Ground
Around Zebulon, the main drain-field limit is slow water movement: water leaves the soil too slowly for a conventional field to keep up. Site conditions on any one lot can differ from the map. See the Zebulon city page for the full soil profile.
Frequently Asked Questions
What services does Busy Beez Construction offer?
Published on their website: Septic System Installation.
How is Busy Beez Construction rated?
5 stars from 10 Google reviews.
Before You Call
For a new septic installation, homeowners may need to balance system placement with trees and other features they want to preserve. One useful question is how the crew would plan the installation around those priorities.